Where it is used
Hull-block assembly
Lift and position prefabricated hull sections at the assembly area.
Block turning
Carry out a designed turning sequence with defined lifting points and reactions.
Dock and berth coverage
Transfer large sections across the crane’s rail-served work envelope.
Product features
Shipyard lifting arrangement
Select trolley and hook arrangements for the hull sections and turning sequence.
PLC and inverter control
Communication-based control coordinates the specified crane motions.
Operating and video monitoring
Monitoring provides operating information and additional views of the lifting area.
Technical specifications
Model: MU
Published shipbuilding table — 2×50+100 t hook-layout reference
These figures come from one column of the published shipbuilding table. The hook notation is retained exactly; coordinated and turning capacities require the stated lifting arrangement and approval. This A5 table is separate from the page’s A7–A8 catalogue summary.
| Published hook arrangement | 2×50+100 t |
|---|---|
| Span | 50 m |
| Lifting height H1 / H2 | 35 m / 35 m |
| Working class | A5 |
| Full-load hoisting speed | 0.5–5 m/min |
| No-load hoisting speed | 1–10 m/min |
| Full-load crane travel | 2.5–25 m/min |
| Full-load trolley travel | 2.5–25 m/min |
| Power supply | 3-phase AC, 50 Hz, 10 kV |
Equipment arrangement
| Model | MU |
|---|---|
| Travel arrangement | Ground-rail gantry travel |
| Leg structure | Rigid leg + flexible leg |
| Bridge options | Single / double girder |
| Control | PLC + inverter communication |
| Monitoring | Operating-data and video monitoring |
Published ranges depend on the selected configuration. Rated load, span, lifting height and duty are confirmed together in your quotation and approval drawing.
Price guide
Hull-block load cases, hook layout, turning sequence, dock dimensions and coastal protection determine the shipyard crane quotation.
What affects the price?
- Complete suspended load and lifting attachment
- Span, hook height and required operating cycle
- Special process controls and environmental protection
- Runway, installation and destination supply scope
Typical configurations
Ship-block handling
Lifting arrangement for large shipbuilding components
Define lifting points, load distribution and permitted handling combinations.
Coordinated motion
PLC and inverter communication control
Specify the required lifting and positioning sequence for block assembly.
Gantry legs
Rigid-leg and flexible-leg arrangement
Coordinate rail geometry, structural reactions and the shipyard working envelope.
Final capacity, dimensions and operating functions are agreed for your load and site.
Compare related models
Compare the lifting arrangement and site layout before choosing a model.
Configuration
General double-trolley full-gantry configuration with independent or joint trolley operation.
Consider it when
Long or multi-point industrial loads require two trolley positions, but dedicated ship-block turning and shipyard portal engineering are unnecessary.
Configuration
Two trolley positions with L-shaped legs providing increased passage clearance for long or rotating loads.
Consider it when
Long fabricated components need to pass through or rotate near the gantry legs without the scale and shipbuilding functions of an MU crane.
Configuration
Two trolley systems combined with a truss bridge and segmented bolted structure.
Consider it when
Long loads, wide yards or sites where segmented transportation and assembly are primary requirements.
Frequently asked questions
Can total block weight be divided equally between lifting points?
Not automatically. Center of gravity, rigging geometry and turning position determine the actual reactions. Each hoisting case needs to be defined.
What decides single- or double-girder construction?
Load, span, stiffness, hoisting arrangement, maintenance access and erection conditions all influence the structural choice for the shipyard.
Product views and components
















