Long-span gantry cranes crossing the bridge construction corridor.
Long-span steel box-girder bridge construction can require a gantry crane to cross a very wide roadway or river-adjacent work area while lifting large fabricated sections. Span, side thrust, wind load, wheel load and lifting height become especially important as gantry width increases.
Henan Mine Crane supplied a 72 m large-span gantry crane for the Jianzhou Bridge project. The crane has a 72 m span, a rated lifting capacity of 75t and a lifting height of 23 m.
Project Background
The Jianzhou Bridge has a total length of 580.5 m and uses a fully welded variable-section continuous steel box girder. The lifting requirements were strict, and the crane was selected after technical discussion and evaluation.
A 72 m gantry span creates greater structural and wind-design challenges than a compact fabrication-yard crane. Runway straightness, foundation stiffness and leg behavior must therefore be considered with the crane structure.
Customer Challenges
- Achieving a 72 m gantry span while controlling structural deflection and self-weight.
- Handling long steel box-girder fabrication and assembly loads.
- Maintaining stable travel across a very wide runway.
- Managing wind loads and out-of-square travel on long-span gantry structures.
- Providing sufficient lifting height for bridge structures and rigging.
- Coordinating crane installation with roadway and bridge construction activities.
Henan Mine Crane Solution
The referenced crane spans 72 m across the Jianzhou Bridge construction area. It has a rated capacity of 75t and a lifting height of 23 m.
For a similar wide-span application, Henan Mine Crane can analyze girder stiffness, leg forces, wheel loads, wind loads and runway geometry together with the lifting requirement.
Travel synchronization, anti-skew protection, braking and storm-safety measures should be defined according to span, site exposure and local design standards.
| Recommended Crane | 72m Large-Span Bridge Construction Gantry Crane |
| Referenced Span | 72 m |
| Project Capacity & Lifting Height | 75t rated capacity + 23 m lifting height |
| Bridge Structure | Fully welded variable-section continuous steel box girder |
| Engineering Focus | Deflection, wind, wheel loads, travel synchronization and runway accuracy |


Key Technical Features
72m Large-Span Coverage
The crane crosses a very wide bridge-construction work zone.
Steel Box-Girder Handling
The project supports construction of a welded steel box-girder bridge.
High Structural Stiffness Requirement
Long spans require careful girder-deflection and leg-force analysis.
Wide-Runway Travel Control
Travel synchronization and anti-skew design become increasingly important as gantry span grows.
Project-Specific Civil Coordination
Runway and foundation behavior must be coordinated with the heavy crane structure.
Application Scenarios
| Steel Box Girder Bridges | Fabrication and lifting of long welded bridge modules. |
| Wide Construction Corridors | Gantry lifting across roads, bridge decks or broad assembly zones. |
| Large Steel Structure Projects | Outdoor handling where conventional workshop cranes cannot provide coverage. |
| Bridge Assembly Yards | Transfer and alignment of large fabricated structural sections. |
Why Choose Henan Mine Crane
- Henan Mine Crane can analyze long-span gantry structure and runway behavior as one system.
- Capacity, lifting height and span can be matched to the actual bridge section and rigging arrangement.
- Travel synchronization, anti-skew and wind protection can be defined for the site environment.
- Installation planning can be coordinated with bridge construction and temporary traffic/site restrictions.
Frequently Asked Questions
What are the most important design inputs for a 72 m span gantry crane?
Provide capacity, lifting height, runway length, rail/foundation data, maximum wind conditions, duty, travel speed, load dimensions and required deflection or positioning limits.
What capacity was shown for the Jianzhou project crane?
The Jianzhou project crane has a 72 m span, a rated capacity of 75t and a lifting height of 23 m.
Does a longer gantry span increase runway requirements?
Yes. Structural deflection, wind response, wheel loads, skew and runway accuracy become more influential as span increases.