Where it is used
Long fabricated goods
Support a long load at its approved lifting points.
Freight-yard handling
Transfer goods between storage, staging and transport positions.
Dockside operations
Plan hook coverage and load passage around the offset supporting legs.
Product features
Two winch trolleys
Provide separate lifting positions for the selected load-handling method.
L-shaped supporting legs
Improve passage around long components and outside-span loading positions.
Controlled travel drives
Integrated frequency-controlled drives support smooth gantry movement.
Technical specifications
Model: MDE
| Rated capacity | 5–50 t |
|---|---|
| Span | 18–35 m |
| Model | MDE |
| Travel arrangement | Ground-rail gantry travel |
| Trolley quantity | Two |
| Leg arrangement | L-shaped offset legs |
| Lifting mechanism | Open-winch trolley |
| Control options | Ground / wireless remote / cabin |
| Power-feed options | Cable / conductor system |
Published ranges depend on the selected configuration. Rated load, span, lifting height and duty are confirmed together in your quotation and approval drawing.
Price guide
The two winch trolleys, L-leg clearance, load-sharing cases and required span determine the equipment quotation.
What affects the price?
- Complete suspended load and lifting attachment
- Span, hook height and required operating cycle
- Special process controls and environmental protection
- Runway, installation and destination supply scope
Typical configurations
Hoisting Mechanism
Winch hoisting
Select the lifting unit around the load, placement task and operating cycle.
Control Method
Ground / remote / cabin
Select the operator position, visibility and control functions required for pickup, travel and placement.
Leg Configuration
L-shaped supporting legs
Check useful hook coverage, clearances and support reactions on your site layout.
Final capacity, dimensions and operating functions are agreed for your load and site.
Compare related models
Compare the lifting arrangement and site layout before choosing a model.
Configuration
General double-trolley full-gantry configuration with independent or joint trolley operation, A3–A8 duty and encoder / inverter coordination.
Consider it when
Two lifting positions are required but additional L-shaped leg clearance is not necessary.
Configuration
Two trolley positions combined with a truss bridge and segmented structural arrangement.
Consider it when
Wide yards, transportation access or structural-weight considerations favor a truss bridge instead of L-shaped legs.
Configuration
Two trolley positions with one elevated building-supported runway and one ground-supported gantry side.
Consider it when
A factory side bay requires two lifting positions and a suitable building structure can support one side of the crane.
Information for your quotation
Provide complete suspended load, maximum per-trolley loads, center of gravity and lifting-point spacing. Include workpiece dimensions and the swept path near the legs.
Send rail span, lifting height, travel length, foundation details and loading positions. Add operating cycles, wind conditions, power supply and the coordination required during long-load handling.
Frequently asked questions
Does the L-shaped leg guarantee truck passage?
No. Check the vehicle, load and leg geometry on the proposed layout at all critical heights.
Can the hooks move independently?
Independent and coordinated operation are configured within agreed working zones and load cases.
Can I select any capacity with any listed span?
The ranges describe the product family. The actual combination depends on load, duty and structural design.











