Where it is used
Long components
Support beams and long fabricated parts at defined lifting points.
Construction yards
Connect fabrication, storage and loading positions along ground rails.
Outdoor assembly
Position large components during a planned lifting and assembly sequence.
Product features
Two-trolley arrangement
Select independent or coordinated lifting for the approved load case.
Open truss construction
A truss bridge provides an open structural layout for outdoor service.
Segmented assembly
Bolted structural sections assist transport and site erection.
Technical specifications
Model: MEH
| Rated capacity | 5–50 t |
|---|---|
| Span | 12–30 m |
| Lifting height | 6–18 m |
| Model | MEH |
| Working class | A3–A5 |
| Travel arrangement | Ground-rail gantry travel |
| Trolley quantity | Two |
| Bridge construction | Truss bridge |
Published ranges depend on the selected configuration. Rated load, span, lifting height and duty are confirmed together in your quotation and approval drawing.
Price guide
A double-trolley truss crane is priced from the load at each trolley, coordinated lifting cases, span and required control package.
What affects the price?
- Complete suspended load and lifting attachment
- Span, hook height and required operating cycle
- Special process controls and environmental protection
- Runway, installation and destination supply scope
Typical configurations
Lifting arrangement
Two trolley lifting positions
Define independent tasks and the load distribution for permitted combined lifts.
Motion control
Variable-frequency hoisting and travel
Specify transfer speeds and positioning for the workpiece.
Truss and coverage
Truss gantry with two, one or no cantilevers
Match hook reach to the positions inside and outside the gantry legs.
Final capacity, dimensions and operating functions are agreed for your load and site.
Compare related models
Compare the lifting arrangement and site layout before choosing a model.
Configuration
General double-trolley gantry structure with two trolley systems capable of independent or combined operation.
Consider it when
Applied where two trolley positions are required but a truss bridge and segmented transportation structure are not necessary.
Configuration
Two trolley positions combined with L-shaped gantry legs and a winch lifting arrangement.
Consider it when
Applied where long or rotating loads require greater open clearance through the gantry-leg area.
Configuration
Two trolley positions with one crane runway integrated into an elevated building-side structure.
Consider it when
Applied to sidewall or restricted production areas where a full ground-supported gantry structure is unnecessary.
Information for your quotation
Provide complete load, maximum reaction at each trolley, dimensions, center of gravity and lifting points. Include required hook spacing, span, height and outside-span reach.
Send rail and foundation details, operating and storm conditions, duty and power supply. Describe transport restrictions, site access, lifting equipment for erection and available assembly space.
Frequently asked questions
Does truss construction remove wind requirements?
No. Operating wind, load wind area and storm parking requirements must still be defined.
Can it ship in sections?
The segmented arrangement supports transport planning. Confirm module dimensions, shipping access and the site assembly procedure for the actual crane.
Can the two trolleys share one load?
A coordinated configuration can be evaluated using individual reactions, permissible hook difference and the complete lifting sequence.











