Skip to content
Henan Mine Crane
Request a quote
Menu

Lifting equipment

QEN Grab & Hook Dual-Purpose Overhead Crane

A grab-and-hook overhead crane handles both bulk material and hook-suspended loads by changing the approved lifting attachment. It is useful in shared production bays where a detachable hydraulic grab serves loose materials while the hook handles maintenance parts, equipment and packaged loads.

Yellow double-girder overhead crane rendering with separate hook and grab bucket
QEN dual-purpose overhead crane with separate hook-lifting capability and removable hydraulic grab for mixed general-load and bulk-material handling.

At a glance

Lifting capacity
5 – 16 t
Span
10.5 – 31.5 m
Lifting height
6 – 20 m
Working duty
A5 – A6

Where it is used

Mixed handling bays

Use a grab for bulk material and an approved hook arrangement for other lifting tasks.

Plant maintenance

Handle equipment or spare parts when the bulk attachment is removed.

Material receiving

Transfer suitable bulk or packaged loads within the same crane working area.

Product features

Two handling methods

A hook and detachable hydraulic grab support different material-handling tasks.

Serviceable grab

Replaceable wear parts simplify grab maintenance in abrasive applications.

Controlled travel

Frequency-controlled motion can be selected to support smooth load placement.

Technical specifications

Model: QEN

ModelQEN
Lifting capacity5 – 16 t
Span10.5 – 31.5 m
Lifting height6 – 20 m
Working dutyA5 – A6
Hoisting speed15 – 40 m/min
Trolley travel speed5 – 20 m/min
Crane travel speed10 – 40 m/min
Protection levelIP54
Power supply220-690V, 50/60 Hz
Control methodWireless Remote / Cabin Control

Published selection ranges are configuration dependent. Rated load, span, height, speed and duty are confirmed together in the project drawing.

Price guide

Request a configuration-specific price for this crane. The quotation is based on the lifting task, site dimensions and the equipment scope below.

What affects the price?

  • Rated load, lifting attachment and duty cycle
  • Bridge span, lifting height and runway length
  • Motion controls, electrical supply and destination requirements
  • Freight, runway structure, installation and commissioning scope
Get a quotation for this product

Typical configurations

General lifting

Hook operating mode

Handle equipment and components using the planned rigging arrangement.

Bulk-material handling

Removable hydraulic grab

Match the grab to the material and define the attachment-change procedure.

Motion control

Variable-frequency control

Specify transfer and placement movements across both operating modes.

Final capacity, dimensions and operating functions are agreed for your load and site.

Compare related models

Compare the lifting arrangement and site layout before choosing a model.

Configuration

Dedicated four-rope grab crane optimized for repetitive bulk-material pickup, transfer and discharge.

Consider it when

Bulk-material handling dominates production and conventional hook lifting is not a regular crane requirement.

Configuration

Dedicated four-rope grab crane with WMS / MES integration, positioning, path planning and automated material-handling functions.

Consider it when

High-cycle bulk handling requires automated pickup, transfer and discharge rather than attachment flexibility.

Configuration

Combines dedicated grab handling with an auxiliary hook-mounted electromagnetic lifting function.

Consider it when

The same crane bay handles both loose bulk material and magnetic steel rather than conventional hook loads.

Plan your crane specification

Send the maximum hook load, load dimensions, lifting points and placement requirements. For grab work, provide material properties, attachment weight, desired payload, pickup depth and discharge height.

Describe the changeover frequency and preferred connection procedure. Include hydraulic supply requirements, electrical connections, attachment storage and the access available for maintenance or replacement of working parts.

Provide the runway span and length, hook elevations, building clearances, power supply and operating hours. A representative work sequence showing hook and grab tasks will help establish machinery duty, useful speeds and the practicality of the combined arrangement.

Frequently asked questions

Is the grab permanently installed?

The QEN arrangement uses a removable hydraulic grab. The connection, hydraulic and electrical interfaces and changeover procedure should be confirmed for the selected attachment and workshop layout.

Can one rated load cover every attachment?

Each working condition must be checked using its complete suspended mass and operating requirements. Different attachment weights can leave different available payloads even on the same crane.

When should a dedicated grab crane be considered?

Consider it where repeated bulk handling controls the production schedule. Compare complete cycle times, load spectrum and required throughput rather than grab operation alone.

Product views and components

YOUR LIFTING PROJECT

Let's find the right crane for your application.

Share the lifting task and the details you already know. A drawing or a clear description helps us review your requirements.

  • Load, dimensions & lifting attachment
  • Span, lifting height & working area
  • Operating frequency & environment
  • Destination, power supply & project scope

Still defining the specification? Mark unknown items as “to be confirmed”.

    Henan Mine Crane uses the contact details and project information you submit to review your enquiry, prepare a response and discuss the requested crane supply or service. Please include only information needed for your project. Questions about your enquiry information? Contact info@hnksglobal.com. Privacy Notice.