Skip to content
Henan Mine Crane
Request a quote
Menu

Lifting equipment

QES Three-Trolley Hook Overhead Crane

A three-trolley overhead crane provides multiple lifting points on a shared bridge for paper-machine maintenance and large component handling. The approved operating modes allow individual lifting or selected paired operation, helping operators support long rolls and equipment without moving a separate crane into the bay.

QES three trolley hook overhead crane for paper mill equipment handling
QES bridge crane with three hook trolley lifting stations for multi-position equipment handling and maintenance in paper mills and other process plants.

At a glance

Lifting trolleys
3 hook trolleys
Operating modes
One trolley individually or a selected pair together
Process interface
PLC sequences; paper-machine DCS interface can be specified
Primary handling task
Paper-machine component handling and maintenance

Choose each trolley rating, bridge span and hook travel from the paper-machine maintenance drawing; permitted paired lifts are defined in the approved load chart.

Where it is used

Paper-machine maintenance

Handle large rolls and components during planned machine servicing.

Roll installation

Position equipment with lifting points located at different positions along the component.

Heavy equipment assembly

Choose the approved trolley combination for each handling sequence.

Product features

Multiple lifting positions

Three trolley positions support different maintenance and assembly lifting arrangements. Each trolley rating and permitted combined operation are defined separately in the approved load chart.

Selectable operating modes

Individual or paired operation follows the approved control logic and crane load limits.

Process control integration

Control interfaces can be specified to match the plant maintenance and production sequence.

Technical specifications

Model: QES

ModelQES
Trolley arrangementThree hook trolleys
Published operating modesOne trolley individually or a selected pair together
Process interfacePLC sequences; paper-machine DCS interface can be specified
Main applicationPaper-machine component handling and maintenance

Published selection ranges are configuration dependent. Rated load, span, height, speed and duty are confirmed together in the project drawing.

Price guide

Request a configuration-specific price for this crane. The quotation is based on the lifting task, site dimensions and the equipment scope below.

What affects the price?

  • Rated load, lifting attachment and duty cycle
  • Bridge span, lifting height and runway length
  • Motion controls, electrical supply and destination requirements
  • Freight, runway structure, installation and commissioning scope
Get a quotation for this product

Typical configurations

Lifting stations

Three hook trolley systems

Assign individual loads and work zones for maintenance and equipment handling.

Coordinated operation

Defined trolley pairs with PLC action sequences

State the permitted lifting combinations, load distribution and inclination limits.

Plant interface

Industrial Ethernet connection to a DCS where specified

Agree commands, feedback and operating responsibility with the plant system.

Final capacity, dimensions and operating functions are agreed for your load and site.

Compare related models

Compare the lifting arrangement and site layout before choosing a model.

Configuration

Uses two trolley lifting systems rather than three and supports independent or coordinated two-point lifting.

Consider it when

Two lifting stations provide sufficient coverage and there is no process requirement for a third dedicated trolley position.

Configuration

Two-trolley platform developed around modular construction, controlled motion and precision tandem-lifting requirements.

Consider it when

Two lifting points are sufficient but headroom, modular transport, positioning or motion-control requirements are important.

Configuration

Uses one primary trolley and hook with low-headroom, micro-speed and electronic anti-sway functions.

Consider it when

Loads can be handled from one lifting position and multi-trolley maintenance coverage is unnecessary.

Frequently asked questions

Can all three trolleys lift together?

Only if that operating case is expressly included in the design. Define the permitted trolley combinations, individual reactions and control requirements.

Does DCS communication make the crane fully automatic?

No. Communication scope and automatic sequences must be specified separately, including commands, feedback, operating permissions and recovery modes.

Product views and components

YOUR LIFTING PROJECT

Let's find the right crane for your application.

Share the lifting task and the details you already know. A drawing or a clear description helps us review your requirements.

  • Load, dimensions & lifting attachment
  • Span, lifting height & working area
  • Operating frequency & environment
  • Destination, power supply & project scope

Still defining the specification? Mark unknown items as “to be confirmed”.

    Henan Mine Crane uses the contact details and project information you submit to review your enquiry, prepare a response and discuss the requested crane supply or service. Please include only information needed for your project. Questions about your enquiry information? Contact info@hnksglobal.com. Privacy Notice.