Where it is used
Paper-machine maintenance
Handle large rolls and components during planned machine servicing.
Roll installation
Position equipment with lifting points located at different positions along the component.
Heavy equipment assembly
Choose the approved trolley combination for each handling sequence.
Product features
Multiple lifting positions
Three trolley positions support different maintenance and assembly lifting arrangements. Each trolley rating and permitted combined operation are defined separately in the approved load chart.
Selectable operating modes
Individual or paired operation follows the approved control logic and crane load limits.
Process control integration
Control interfaces can be specified to match the plant maintenance and production sequence.
Technical specifications
Model: QES
| Model | QES |
|---|---|
| Trolley arrangement | Three hook trolleys |
| Published operating modes | One trolley individually or a selected pair together |
| Process interface | PLC sequences; paper-machine DCS interface can be specified |
| Main application | Paper-machine component handling and maintenance |
Published selection ranges are configuration dependent. Rated load, span, height, speed and duty are confirmed together in the project drawing.
Price guide
Request a configuration-specific price for this crane. The quotation is based on the lifting task, site dimensions and the equipment scope below.
What affects the price?
- Rated load, lifting attachment and duty cycle
- Bridge span, lifting height and runway length
- Motion controls, electrical supply and destination requirements
- Freight, runway structure, installation and commissioning scope
Typical configurations
Lifting stations
Three hook trolley systems
Assign individual loads and work zones for maintenance and equipment handling.
Coordinated operation
Defined trolley pairs with PLC action sequences
State the permitted lifting combinations, load distribution and inclination limits.
Plant interface
Industrial Ethernet connection to a DCS where specified
Agree commands, feedback and operating responsibility with the plant system.
Final capacity, dimensions and operating functions are agreed for your load and site.
Compare related models
Compare the lifting arrangement and site layout before choosing a model.
Configuration
Uses two trolley lifting systems rather than three and supports independent or coordinated two-point lifting.
Consider it when
Two lifting stations provide sufficient coverage and there is no process requirement for a third dedicated trolley position.
Configuration
Two-trolley platform developed around modular construction, controlled motion and precision tandem-lifting requirements.
Consider it when
Two lifting points are sufficient but headroom, modular transport, positioning or motion-control requirements are important.
Configuration
Uses one primary trolley and hook with low-headroom, micro-speed and electronic anti-sway functions.
Consider it when
Loads can be handled from one lifting position and multi-trolley maintenance coverage is unnecessary.
Frequently asked questions
Can all three trolleys lift together?
Only if that operating case is expressly included in the design. Define the permitted trolley combinations, individual reactions and control requirements.
Does DCS communication make the crane fully automatic?
No. Communication scope and automatic sequences must be specified separately, including commands, feedback, operating permissions and recovery modes.
Product views and components














