Where it is used
Workshop walls
Serve a lifting corridor beside a suitable elevated runway.
Warehouse edges
Move equipment and goods along storage and loading positions.
Restricted corridors
Use a semi-gantry footprint where a second ground-level leg would obstruct access.
Product features
One ground-running side
Reduce the supporting structure within the floor-level working area.
Conventional hook flexibility
Handle machinery and fabricated loads with suitable rigging.
Building interface
Integrate the elevated runway with the verified supporting structure.
Technical specifications
Model: MGB
MGB — published hnkscrane.net selection reference
Published selection reference from hnkscrane.net for the named model. These are separate catalogue options, not one guaranteed combination. Your rated load, dimensions, duty and speeds are confirmed together in the quotation and approval drawing.
| Reference capacity options | 2 / 3 / 5 / 10 / 16 / 20 t |
|---|---|
| Reference effective span | Approx. 5–28 m |
| Reference lifting-height options | 6 m standard; 9 / 12 / 18 / 24 / 30 m optional |
| Reference duty options | A3 / A4 / A5 |
Equipment arrangement
| Model | MGB |
|---|---|
| Runway arrangement | One elevated runway + one ground rail |
| Main girder arrangement | Double girder |
| Lifting attachment | Hook |
| Handling motions | Vertical lift, trolley cross travel and gantry long travel |
Published ranges depend on the selected configuration. Rated load, span, lifting height and duty are confirmed together in your quotation and approval drawing.
Price guide
Public supplier equipment-price references for the stated configuration, checked October 2026. These figures support early budgeting; your quotation will be based on the selected crane and supply scope. Freight, import duties, runway rails, foundations, installation and commissioning are additional unless included in the quotation.
| Configuration | Equipment budget | Supply scope |
|---|---|---|
| Single- and double-girder semi-gantry familyCapacity: 2–40 t · Span: 15–30 m · Lift: 6 / 9 / 12 m and project optionsA broad comparable family range spanning different capacities and girder designs; it is not a price for every model or every 40 t configuration. | USD 6,000–100,000per unit | Crane equipment reference; confirm inclusions and destination costs. |
Indicative market budgets for planning, not a quotation from Henan Mine Crane. Freight, taxes, runway steel and site installation are additional unless included in the scope shown. Request a quotation for your selected configuration.
What affects the price?
- Rated load, span and lifting height
- Working class, lifting speed and operating cycle
- Hoist, controls, cantilever and outdoor protection
- Delivery destination and installation scope
Typical configurations
Load pickup
Hook trolley
Match rigging height and load dimensions to the required placement positions.
Bridge structure
Double-girder semi-gantry
Assess the hook coverage within the building-side work area.
Runway arrangement
One elevated building runway and one ground rail
Coordinate building reactions, ground traffic and clearances on the same layout.
Final capacity, dimensions and operating functions are agreed for your load and site.
Compare related models
Compare the lifting arrangement and site layout before choosing a model.
Configuration
Uses an electric-hoist lifting system with compact double-girder geometry and A3–A5 duty.
Consider it when
Low workshops and narrow production aisles where compact external dimensions and electric-hoist lifting are required.
Configuration
Low-headroom electric-hoist semi-gantry with compact dimensions, A3–A5 duty and integrated travel drives.
Consider it when
Projects where roof clearance, side clearance and local control requirements strongly influence crane selection.
Configuration
Adds two trolley lifting positions, A3–A8 duty, VFD control and optional linked-crane communication.
Consider it when
Multiple lifting points, separate trolley working zones or more complex side-bay production processes.
Plan your crane specification
Provide building drawings showing columns, elevated runway beams, rail level and allowable reactions. Add ground-rail and foundation information, the relative elevations of both sides and the required working length.
Send the load weights, dimensions, lifting points and handling sequence. Mark pickup and placement positions, floor obstructions, vehicle routes and the required hook coverage on a plan and section.
State lifting frequency, shifts, control preference, power supply and environmental exposure. Identify installation access and any limits on strengthening the building or modifying the floor so the proposed semi-gantry arrangement can be checked against the site's practical constraints.
Frequently asked questions
Can the MGB use my existing building runway?
Possibly, after its structure, rail arrangement and allowable reactions have been checked against the proposed crane. Existing supports should not be assumed adequate without the relevant drawings and calculations.
Does a semi-gantry save ground space on both sides?
One side uses an elevated runway instead of a ground-supported leg. The opposite side still requires a ground rail, foundation and clear travel corridor, which must be included in the site layout.
Why are the two runway elevations important?
They establish the bridge and leg geometry. Alignment and structural movement on both sides affect the complete crane, so elevated and ground supports must be coordinated together.











