Where it is used
Heavy assembly
Handle fabricated structures, machinery and large components between assembly stages.
Workshop maintenance
Remove equipment and position replacement parts along the production bay.
Material handling
Transfer coils, bundled steel or other loads using an attachment matched to the material.
Product features
Rigid bridge platform
Two main girders support the trolley and provide a stable basis for the selected lifting arrangement.
Attachment flexibility
Hooks and application-specific lifting devices can be matched to the workpiece.
Duty-based selection
Hoist type, speeds and working class are selected from lift frequency and the load spectrum.
Technical specifications
| Example model | LH |
|---|---|
| LH example — Lifting capacity | 3 – 32 t |
| LH example — Span | 7.5 – 31.5 m |
| LH example — Lifting height | 6 – 30 m |
| LH example — Working duty | A3 – A5 |
| LH example — Protection level | IP54 |
| LH example — Power supply | 220-690V, 50/60 Hz |
| LH example — Control method | Wireless Remote / Cabin Control |
The named example illustrates one configuration; it does not define every crane in this category.
Price guide
Prices below are public market references for the stated configurations. They are not a current Henan Mine Crane quotation. Confirm the current equipment price and delivery scope for your project.
| Configuration | Equipment budget | Supply scope |
|---|---|---|
| LH electric-hoist double-girder exampleCapacity: 10 t · Span: 22.5 m · Lift: 9 mPublished: 2025-07-03 | USD 20,714per unit | Published 3 July 2025; floor control, 7 m/min lifting and 20 m/min travel. Public equipment-price example; installed project cost requires confirmation. |
Indicative market budgets for planning, not a quotation from Henan Mine Crane. Freight, taxes, runway steel and site installation are additional unless included in the scope shown. Request a quotation for your selected configuration.
What affects the price?
- Rated load, lifting attachment and duty cycle
- Bridge span, lifting height and runway length
- Motion controls, electrical supply and destination requirements
- Freight, runway structure, installation and commissioning scope
Typical configurations
Lifting mechanism
Electric wire-rope hoist or electric-hoist trolley
Match the unit to load, duty, lift height and positioning.
Hoisting control
Fixed, dual-speed or variable-frequency option
Choose operating speeds for transfer and final placement.
Bridge arrangement
Single- or double-girder overhead bridge
Compare headroom, hook coverage and structural reactions for the building.
Final capacity, dimensions and operating functions are agreed for your load and site.
Compare related models
Compare the lifting arrangement and site layout before choosing a model.
Configuration
compact general-purpose wire-rope hoist.
Consider it when
Straightforward industrial lifting where low headroom, IoT or specialized modular functions are not primary requirements.
Configuration
Modern modular hoist with standardized interfaces and optional remote status visibility.
Consider it when
Maintenance planning, modular serviceability and equipment monitoring have measurable value.
Configuration
Optimized motor and drum layout to reduce hoist height.
Consider it when
Existing building or crane requires a higher upper hook position within restricted vertical clearance.
Information for your quotation
Provide workpiece and attachment weights, span, hook height, runway length and roof clearance. Include load dimensions, pickup locations and the final placement task.
Send working hours, load spectrum, cycles and positioning requirements. Share runway structure, site power and controls. If multiple hooks are needed, provide lifting-point reactions and required spacing.
Frequently asked questions
Does electric hoist mean single girder?
No. Packaged electric hoists can be used in several bridge and trolley layouts, including double-girder configurations.
When should I consider low headroom?
When a standard arrangement cannot provide the required hook height within the roof and runway envelope.
Can one crane handle long loads at two points?
A double- or multi-trolley configuration can be evaluated with the load geometry, individual reactions and coordinated operating requirements.
Product views and components












