Skip to content
Henan Mine Crane
Request a quote
Menu

Lifting equipment

MEN Double-Trolley Electromagnetic & Hook Gantry Crane

The MEN double-trolley electromagnetic-and-hook gantry crane combines two lifting trolleys with magnetic and conventional hook handling. It is intended for steel yards and industrial areas handling magnetic materials and long workpieces. Trolley coordination and the lifting attachment are selected for the material, lifting points and required handling sequence.

MEN double trolley electromagnetic and hook gantry crane
MEN double-trolley gantry crane equipped with an electromagnetic lifting device and hook for magnetic steel and general-load handling.

At a glance

Rated capacity
10–50 t
Span
18–35 m
Lifting height
8–24 m
Working class
A3–A8

Where it is used

Steel storage yards

Handle compatible steel products and organize storage rows.

Long steel sections

Use planned lifting-point spacing for long workpieces.

Mixed steel and equipment handling

Use magnetic attachments for suitable steel and hooks for conventionally rigged loads.

Product features

Two lifting trolleys

Support independent tasks or an approved coordinated lifting arrangement.

Magnet and hook modes

Match the attachment to the load material and geometry.

PLC operator interface

The control platform supports coordinated motion and clear operating information.

Technical specifications

Model: MEN

Rated capacity10–50 t
Span18–35 m
Lifting height8–24 m
Trolley quantity2
ModelMEN
Working classA3–A8
Travel arrangementGround-rail gantry travel

Published ranges depend on the selected configuration. Rated load, span, lifting height and duty are confirmed together in your quotation and approval drawing.

Price guide

A double-trolley magnetic crane needs the steel load, magnet system, hook arrangement, synchronization requirements and duty before pricing.

What affects the price?

  • Complete suspended load and lifting attachment
  • Span, hook height and required operating cycle
  • Special process controls and environmental protection
  • Runway, installation and destination supply scope
Get a quotation for this product

Typical configurations

Lifting Attachments

Electromagnetic lifter + hook

Match the pickup method to the material, load geometry and handling sequence.

Control System

PLC module, HMI touch screen and WLK master controller

Match transfer and final placement to the required operating sequence.

Trolley Arrangement

Double trolley

Plan the lifting positions and load distribution for the workpiece.

Final capacity, dimensions and operating functions are agreed for your load and site.

Compare related models

Compare the lifting arrangement and site layout before choosing a model.

Configuration

Dedicated electromagnetic gantry crane centered on magnetic-material lifting.

Consider it when

Used where steel pickup is the primary process and a separate double-trolley magnetic-and-hook arrangement is unnecessary.

Configuration

General double-trolley gantry crane with independent or combined trolley operation.

Consider it when

Used where two trolley positions are required but electromagnetic steel handling is not the primary process.

Configuration

Two trolley positions combined with L-shaped gantry legs for increased long-load passage space.

Consider it when

Used where long or rotating loads require greater clearance through the gantry-leg area.

Information for your quotation

Provide magnetic material types, dimensions, temperature and pickup-surface condition. List maximum magnetic loads, hook loads, attachment weights and required trolley modes.

Include span, hook heights, rail length, outreach, storage layout, daily cycles and power supply. Define backup holding, alarms, operator controls and rail-foundation information.

Frequently asked questions

Can the hook handle nonmagnetic loads?

Hook operation can handle suitable rigged loads within its agreed rating and operating mode.

Can both trolleys lift at once?

Confirm permitted simultaneous or combined operation in the technical arrangement. Individual trolley ratings do not establish the allowable total bridge load.

Is one magnet suitable for all steel?

Material geometry, contact area, surface condition and temperature determine magnetic-system selection.

Product views and components

YOUR LIFTING PROJECT

Let's find the right crane for your application.

Share the lifting task and the details you already know. A drawing or a clear description helps us review your requirements.

  • Load, dimensions & lifting attachment
  • Span, lifting height & working area
  • Operating frequency & environment
  • Destination, power supply & project scope

Still defining the specification? Mark unknown items as “to be confirmed”.

    Henan Mine Crane uses the contact details and project information you submit to review your enquiry, prepare a response and discuss the requested crane supply or service. Please include only information needed for your project. Questions about your enquiry information? Contact info@hnksglobal.com. Privacy Notice.