Where it is used
Steel storage yards
Handle compatible steel products and organize storage rows.
Long steel sections
Use planned lifting-point spacing for long workpieces.
Mixed steel and equipment handling
Use magnetic attachments for suitable steel and hooks for conventionally rigged loads.
Product features
Two lifting trolleys
Support independent tasks or an approved coordinated lifting arrangement.
Magnet and hook modes
Match the attachment to the load material and geometry.
PLC operator interface
The control platform supports coordinated motion and clear operating information.
Technical specifications
Model: MEN
| Rated capacity | 10–50 t |
|---|---|
| Span | 18–35 m |
| Lifting height | 8–24 m |
| Trolley quantity | 2 |
| Model | MEN |
| Working class | A3–A8 |
| Travel arrangement | Ground-rail gantry travel |
Published ranges depend on the selected configuration. Rated load, span, lifting height and duty are confirmed together in your quotation and approval drawing.
Price guide
A double-trolley magnetic crane needs the steel load, magnet system, hook arrangement, synchronization requirements and duty before pricing.
What affects the price?
- Complete suspended load and lifting attachment
- Span, hook height and required operating cycle
- Special process controls and environmental protection
- Runway, installation and destination supply scope
Typical configurations
Lifting Attachments
Electromagnetic lifter + hook
Match the pickup method to the material, load geometry and handling sequence.
Control System
PLC module, HMI touch screen and WLK master controller
Match transfer and final placement to the required operating sequence.
Trolley Arrangement
Double trolley
Plan the lifting positions and load distribution for the workpiece.
Final capacity, dimensions and operating functions are agreed for your load and site.
Compare related models
Compare the lifting arrangement and site layout before choosing a model.
Configuration
Dedicated electromagnetic gantry crane centered on magnetic-material lifting.
Consider it when
Used where steel pickup is the primary process and a separate double-trolley magnetic-and-hook arrangement is unnecessary.
Configuration
General double-trolley gantry crane with independent or combined trolley operation.
Consider it when
Used where two trolley positions are required but electromagnetic steel handling is not the primary process.
Configuration
Two trolley positions combined with L-shaped gantry legs for increased long-load passage space.
Consider it when
Used where long or rotating loads require greater clearance through the gantry-leg area.
Information for your quotation
Provide magnetic material types, dimensions, temperature and pickup-surface condition. List maximum magnetic loads, hook loads, attachment weights and required trolley modes.
Include span, hook heights, rail length, outreach, storage layout, daily cycles and power supply. Define backup holding, alarms, operator controls and rail-foundation information.
Frequently asked questions
Can the hook handle nonmagnetic loads?
Hook operation can handle suitable rigged loads within its agreed rating and operating mode.
Can both trolleys lift at once?
Confirm permitted simultaneous or combined operation in the technical arrangement. Individual trolley ratings do not establish the allowable total bridge load.
Is one magnet suitable for all steel?
Material geometry, contact area, surface condition and temperature determine magnetic-system selection.











