Ultra-high-capacity Henan Mine Crane gantry crane operating at a large waterfront industrial project.
Ultra-heavy industrial projects need gantry cranes that can lift hundreds of tonnes while controlling wheel loads, multi-point synchronization and energy consumption. At this scale, the crane and civil works must be engineered together.
Henan Mine Crane manufactured a 750t double-girder gantry crane for a project in Zhejiang. Its configuration includes PLC + VFD communication control, multi-lifting-point synchronized balance, single-side double-rail travel, automatic positioning, 10 kV power and regenerative energy recovery.
Project Background
A 750t-class gantry crane produces substantial wheel loads and structural forces. Runway arrangement, rail geometry, foundation design and lifting-point synchronization must be confirmed before fabrication.
During lowering of very heavy loads, regenerative energy can be significant. The project uses electrical energy recovery during lowering. Energy savings of 25–30% were reported for this specific crane; this project result is not a guaranteed saving for other applications.
Customer Challenges
- Handling 750t-class loads without excessive runway wheel pressure.
- Synchronizing multiple lifting points to keep the load balanced.
- Maintaining stable travel and positioning over a large outdoor project area.
- Reducing structural self-weight while preserving safety and fatigue resistance.
- Managing high-voltage crane power supply and regenerative lowering energy.
- Integrating safety monitoring for an ultra-heavy crane.
Henan Mine Crane Solution
The crane uses a whole-vehicle safety monitoring system and PLC + VFD communication control. Multi-lifting-point synchronization automatically adjusts load balance during lifting.
A single-side double-rail arrangement reduces bridge-travel wheel pressure for the special project condition. Automatic positioning improves placement efficiency.
High-strength special steel is used in the structure. The crane uses a 10 kV power supply, and lowering energy is automatically recovered. The 25–30% energy-saving value is a reported result for this specific project, not a universal guarantee.
| Recommended Crane | 750t Double-Girder Heavy-Duty Gantry Crane |
| Control | PLC + VFD communication control |
| Lifting | Multi-point synchronized control with automatic balance adjustment |
| Runway Concept | Single-side double-rail design for project wheel-load requirements |
| Power / Energy | 10 kV supply + regenerative energy recovery during lowering |



Key Technical Features
750t Ultra-Heavy Lifting
The project crane is engineered for very large industrial loads.
Multi-Point Synchronization
Automatic balance adjustment supports controlled lifting from several points.
Wheel-Load Optimization
The project crane uses a special single-side double-rail arrangement to reduce travel wheel pressure.
Automatic Positioning
Positioning functions improve repeatability during pickup and placement.
Regenerative Energy Recovery
Electrical energy generated during lowering is recovered. Reported energy savings of 25–30% apply to this specific project; savings for other applications depend on the operating conditions.
Safety Monitoring
Whole-crane safety monitoring provides operating status and protection information.
Application Scenarios
| Heavy Industrial Construction | Handling oversized prefabricated or assembled structures. |
| Large Equipment Manufacturing | Ultra-heavy transfer and assembly of industrial modules. |
| Port-Side Heavy Projects | Large outdoor lifting where gantry coverage is required. |
| Special Runway Projects | Sites requiring engineered wheel-load distribution and high-capacity rail systems. |
Why Choose Henan Mine Crane
- Henan Mine Crane can coordinate crane structure, wheel loads and runway concepts at the early engineering stage.
- Multi-point synchronization can be designed from the actual lifting frame and allowable load tilt.
- High-voltage power and regenerative drives can be configured for the project electrical system.
- Heavy-load monitoring, automatic positioning and maintenance access can be incorporated during initial design.
Frequently Asked Questions
What data is required for a 750t gantry crane quotation?
Provide maximum load, rigging and lifting-beam weight, load dimensions, lifting points, span, lifting height, runway length, foundation or rail information, operating cycles, power supply and required synchronization accuracy.
Why would a heavy gantry crane use multiple rails?
At very high capacity, wheel loads can govern civil design. A project-specific multi-rail arrangement can distribute loads more effectively when site geometry permits.
How much energy can regenerative lowering save?
Energy savings of 25–30% were reported for this specific project. This is a project-specific result rather than a guaranteed saving. Actual savings depend on load cycles, lowering height, operating time and electrical-system design.