Where it is used
Equipment plants
Transfer large components between assembly and inspection.
Storage yards
Move components between prepared supports and working positions.
Dispatch areas
Align approved loads with road or port transport positions.
Product features
Matched attachment
Use lifting beams suited to the approved component lifting zones.
Wide load envelope
Size the opening for the component and operating clearance.
Route-based mobility
Coordinate steering, pavement and gradients with loaded travel.
Technical specifications
Published wind-blade project — Cimolai Technology MST 50
Cimolai Technology MST 50 wind-blade handling project reference. These are not Henan Mine Crane project ratings. Load capacity, usable opening, lifting speed and support arrangement are selected for your blade, approved support points and travel route.
| Reference model | MST 50 |
|---|---|
| Handling operation | Lift and store wind turbine blades |
| Blade interface | Special support frames fixed to the spreader |
| Travel arrangement | Rubber-tyred mobile carrier |
| Attachment purpose | Limit blade twisting and irregular stresses |
Equipment arrangement
| Equipment form | Open-frame mobile lift-and-carry machine |
|---|---|
| Travel system | Rubber tyres |
| Lifting arrangement | Approved lifting points and lifting plan |
| Attachment | Beam, spreader or other approved attachment |
| Frame opening | Load width, height and lifting clearance |
| Load basis | Complete suspended load including attachments |
| Travel route | Prepared pavement with checked wheel reactions |
| Steering and control | Matched to route geometry and visibility |
Price guide
Send the maximum load, load dimensions, lifting points and site layout to receive an equipment quotation matched to your operation.
What affects the price?
- Rated load and attachment
- Clear width and lift height
- Travel route, steering and pavement
- Power system and duty
Typical configurations
Component pickup
Lifting arrangement for blades, towers or nacelles
Use the designated lifting points and component-specific handling accessories.
Loaded transport
Rubber-tired movement between work stations
Plan production, storage and loading transfers for the selected component.
Route geometry
Clearances matched to component length and diameter
Check blade overhang, tower diameter and turning space throughout the route.
Final capacity, dimensions and operating functions are agreed for your load and site.
Compare related models
Compare the lifting arrangement and site layout before choosing a model.
Configuration
General industrial straddle carrier for beams, pipes, modules and other oversized loads.
Consider it when
Several oversized industrial load families require one general mobile lifting and transport platform rather than a wind-specific carrier.
Configuration
Straddle carrier configured around complete prefabricated housing modules and constrained modular-building production routes.
Consider it when
Modular buildings rather than wind turbine components dominate the production and transport process.
Configuration
A-frame rubber-tired gantry configuration for long, heavy components across bridge, wind-energy and heavy civil applications.
Consider it when
The application includes wind components together with other long heavy project loads and an A-frame layout matches the handling process.
Frequently asked questions
Can the same carrier handle blades and nacelles?
It depends on the agreed machine and attachment range. Their geometry, load distribution and handling rules differ, so each product family needs evaluation.
What matters most for long-blade routes?
Include the complete blade envelope and overhang through every turn, along with lifting-point geometry, ground clearance and the final approach to supports or trailers.









