Where it is used
Production handling
Move materials and components between machines, assembly positions and inspection stations.
Plant maintenance
Remove equipment and position replacement parts along the service bay.
Storage and dispatch
Handle approved stock and finished products using the hook or attachment matched to the load.
Product features
Choice of bridge layout
Select single or double girders from the load, span, hook height and required duty.
Three-direction handling
Bridge travel, trolley travel and hoisting cover lifting positions across the working bay.
Application-specific equipment
Choose the hoist, controls and lifting attachment around the material and daily handling cycle.
Technical specifications
| Reference configuration | LD single-girder electric-hoist overhead crane |
|---|---|
| Published capacity options | 1, 2, 3, 5, 10, 16 or 20 t |
| Reference spans | 7.5, 11.5, 14.5, 17.5, 19.5, 22.5, 25.5 or 28.5 m |
| Reference lifting heights | 6, 9, 12, 18, 24 or 30 m |
| Working duty | A3-A5 for the LD platform; select from the actual operating cycle |
The named example illustrates one configuration; it does not define every crane in this category.
Price guide
Prices below are public market references for the stated configurations. They are not a current Henan Mine Crane quotation. Confirm the current equipment price and delivery scope for your project.
| Configuration | Equipment budget | Supply scope |
|---|---|---|
| LD single-girder market referenceCapacity: 5 t · Span: 7.5–37.5 m · Lift: 6–30 mPublished: 2025-07-03 | USD 2,439–16,214per unit | Published 3 July 2025; equipment price reference for a box/I-beam LD bridge with CD/MD hoist and listed Chinese-brand components. Freight, runway steel and site installation require separate confirmation. |
| LD single-girder market referenceCapacity: 10 t · Span: 7.5–37.5 m · Lift: 9–30 mPublished: 2025-07-03 | USD 3,646–20,442per unit | Published 3 July 2025; equipment price reference for a box/I-beam LD bridge with CD/MD hoist and listed Chinese-brand components. Freight, runway steel and site installation require separate confirmation. |
| LD single-girder market referenceCapacity: 20 t · Span: 7.5–37.5 m · Lift: 9–30 mPublished: 2025-07-03 | USD 6,712–29,926per unit | Published 3 July 2025; equipment price reference for a box/I-beam LD bridge with CD/MD hoist and listed Chinese-brand components. Freight, runway steel and site installation require separate confirmation. |
| LH electric-hoist double-girder exampleCapacity: 10 t · Span: 22.5 m · Lift: 9 mPublished: 2025-07-03 | USD 20,714per unit | Published 3 July 2025; floor control, 7 m/min lifting and 20 m/min travel. Public equipment-price example; installed project cost requires confirmation. |
Indicative market budgets for planning, not a quotation from Henan Mine Crane. Freight, taxes, runway steel and site installation are additional unless included in the scope shown. Request a quotation for your selected configuration.
What affects the price?
- Rated load, lifting attachment and duty cycle
- Bridge span, lifting height and runway length
- Motion controls, electrical supply and destination requirements
- Freight, runway structure, installation and commissioning scope
Typical configurations
Bridge layout
Single- or double-girder overhead bridge
Match the structure to the load, duty and available hook envelope.
Building interface
Top-running or underhung support arrangement
Check runway elevation, roof clearance and structural reactions.
Load pickup
Hook, grab, magnetic or specialist attachment
Include attachment weight, power and operating functions in crane selection.
Final capacity, dimensions and operating functions are agreed for your load and site.
Compare related models
Compare the lifting arrangement and site layout before choosing a model.
Configuration
LD single-girder electric-hoist overhead crane.
Consider it when
General workshop loads, span and duty fit a single-girder arrangement.
Configuration
LH double-girder bridge with a seated electric-hoist trolley.
Consider it when
Hook geometry, structural needs or the load and duty require a double-girder platform.
Configuration
LX underhung single-girder crane on suspended runways.
Consider it when
The verified supporting structure can carry suspension loads and floor columns should be avoided.
Installed project cost and supply scope
An equipment price is one part of the installed project budget. Compare offers for the same load, span, hook height, duty, speeds and control functions, then ask each supplier to mark the following items as included, excluded or by others.
For capacity-specific configurations and budgeting, review our 10 ton overhead crane and 20 ton overhead crane pages. Compare the same span, lift height, duty and supply scope before using a price as a reference.
| Scope item | What to confirm in the quotation |
|---|---|
| Crane equipment | Bridge, end carriages, hoist or trolley, controls and below-hook attachments; list quantities and the agreed configuration. |
| Runway and building | Rails and fixings, runway beams or columns, foundations and structural assessment or reinforcement; confirm the supply boundary and designer. |
| Electrical connection | Runway power supply, isolator, cables and connection to the site supply; identify the site work and responsible party. |
| Delivery and import | Packing, transport, insurance where applicable, unloading, customs clearance and taxes; state the delivery term, named place and currency. |
| Installation and access | Erection labour, lifting equipment, site access, alignment and production shutdown requirements; allocate each item. |
| Testing and handover | Commissioning, applicable tests, test-load arrangements, documents and operator training; identify acceptance criteria and the responsible party. |
Add separately priced site work and delivery charges before comparing project totals. Confirm quotation validity and payment milestones, and keep unpriced items visible as allowances rather than assuming they are included.
Frequently asked questions
Is rated capacity enough to choose a crane?
No. Span, hook coverage, duty, load geometry, building reactions and the working environment also determine the crane configuration.
When should an attachment be selected?
Select it alongside the crane. Its weight, dimensions, power needs and operating functions affect capacity, hook height, controls and cycle performance.
Do FOB or CIF prices include delivery and installation at my factory?
Not by the trade term alone. Under Incoterms® 2020, FOB puts the main freight arrangement with the buyer; CIF requires the seller to arrange freight and insurance to the named destination port. In both, risk normally transfers when the goods are loaded on board at the shipment port.
Compare these costs separately, avoiding charges already included in the offer:
- Import clearance, duties and taxes, plus destination handling charges where excluded.
- Transport from the port to your factory, site unloading and any lifting equipment.
- Runway work, crane installation, commissioning and agreed handover activities.
Name the shipment port for FOB or destination port for CIF, and state the Incoterms® version. Confirm insurance cover, exclusions and any additional cover required. FOB and CIF apply to sea or inland waterway transport; for container-terminal handover, agree a suitable rule with your forwarder. Send the destination port, factory location and required site services with your crane specification.
See ICC Academy’s FOB explanation and CIF explanation for the delivery and insurance distinctions.