Where it is used
Bulk stockyards
Transfer loose material between stockpiles and loading positions.
Hopper feeding
Supply a compatible hopper or process intake with a matched grab.
Bulk loading
Load suitable loose materials into vehicles or receiving areas.
Product features
Dedicated grab arrangement
Select the grab and operating mechanism for the material.
Repeatable handling cycle
Coordinate grab opening, lifting and travel for the required transfer sequence.
Operator visibility options
Camera systems and control features can support the specified operating arrangement.
Technical specifications
Model: MZ
Aicrane AQ-MZ — published 10 t grab-gantry reference
One 10 t column from Aicrane’s AQ-MZ double-girder grab-gantry table. It is a named external reference for bulk handling; it is not a Henan Mine Crane rating or a promised combination of every span and height option.
| Reference capacity | 10 t |
|---|---|
| Span options | 18–35 m |
| Lifting-height options | 6–18 m |
| Working-class options | A5–A7 |
| Hoisting speed | 39.3 m/min |
| Trolley travel | 31.7 m/min |
| Crane travel | 37.7 m/min |
Equipment arrangement
| Model | MZ |
|---|---|
| Published grab opening/closing time | 3–5 s for the stated grab mechanism |
| Travel arrangement | Ground-rail gantry travel |
| Main girder arrangement | Double girder |
| Attachment | Bulk-material grab |
| Visibility options | Multi-camera image system |
Published ranges depend on the selected configuration. Rated load, span, lifting height and duty are confirmed together in your quotation and approval drawing.
Price guide
Grab volume, material density, required transfer rate, lift height and duty determine the crane and grab quotation.
What affects the price?
- Complete suspended load and lifting attachment
- Span, hook height and required operating cycle
- Special process controls and environmental protection
- Runway, installation and destination supply scope
Typical configurations
Lifting Attachment
Grab bucket
Match the pickup method to the material, load geometry and handling sequence.
Automation
One-button automatic operation with manual / automatic transition
Match transfer and final placement to the required operating sequence.
Main Structure
Double-main-girder gantry structure
Check useful hook coverage, clearances and support reactions on your site layout.
Final capacity, dimensions and operating functions are agreed for your load and site.
Compare related models
Compare the lifting arrangement and site layout before choosing a model.
Configuration
Quick-change arrangement allows the crane to alternate between grab handling and conventional hook lifting.
Consider it when
Loose bulk material and general suspended cargo share the same rail-mounted handling area.
Configuration
Combines grab and hook operation on an electric-hoist gantry platform with a dedicated attachment-change arrangement.
Consider it when
Bulk and general cargo both require handling and the electric-hoist gantry platform matches the required load and operating cycle.
Configuration
Uses an electromagnetic lifting system instead of a grab bucket.
Consider it when
Scrap steel, billets and other suitable magnetic materials form the primary material stream.
Plan your crane specification
Provide material bulk density, particle range, moisture, abrasiveness and any tendency to compact or adhere. State the target material throughput, operating hours, shifts and expected load spectrum.
Show the storage area, pickup depth, discharge openings, receiving equipment and travel distances on a plan and section. Include span, hook travel, runway length, rail and foundation information, power supply and wind exposure.
If automated functions are required, identify the fixed positions, receiving-equipment interlocks, camera views and manual operating method. These details allow the grab, hoisting machinery, travel controls and site interfaces to be assessed as one bulk-handling cycle.
Frequently asked questions
Does grab volume determine handling capacity?
No. The grab weight, material density and filling behaviour determine the lifting load, while the complete lifting and travel cycle determines throughput. Provide both material data and the required handling rate.
Can the crane operate automatically?
Defined automatic functions can be considered with manual transition. Specify pickup and discharge positions, process interfaces, observation requirements and operating limits so the automation scope can be clearly established.
Should I choose MZ or a grab-and-hook crane?
MZ is aimed at dedicated bulk handling. If the work regularly changes to machinery or packaged loads, compare a dual-purpose arrangement using the actual task mix and attachment-change requirements.











