Where it is used
Fabrication and assembly
Move components between preparation, welding, assembly and dispatch positions.
Storage and loading
Serve organized storage rows and truck-loading areas along a defined rail corridor.
Equipment handling
Lift machinery and fabricated equipment with suitable hooks, slings or lifting beams.
Product features
Straightforward electric-hoist layout
A compact lifting arrangement supports routine material handling and accessible maintenance.
Optional cantilever reach
An engineered cantilever can extend hook coverage outside the rail span.
Flexible working area
Combine hoist travel and gantry travel to serve storage, production and loading positions.
Technical specifications
Model: Gantry crane system
MH electric-hoist table — 5 t reference options
A separate published MH electric-hoist table lists these options for its 5 t column. The table does not specify the span for this column; do not combine it with a span range as a confirmed configuration.
| Reference capacity | 5 t |
|---|---|
| Lifting-height options | 6 / 9 / 12 m |
| Hoisting-speed options | 8 m/min or 8/0.8 m/min |
| Hoist travel | 20 m/min |
| Working-class options | A3 / A4 |
| Power example | 380 V, 50 Hz, 3-phase AC |
Equipment arrangement
| Reference configuration | MH family; selected configuration confirmed in quotation |
|---|---|
| Available configurations | Single / double girder; full / semi-gantry; box / truss bridge |
| MH reference rated capacity | 1–32 t |
| MH reference span | 4–35 m |
| MH reference lifting height | 4–12 m |
| Lifting mechanism | Electric hoist |
| Travel arrangement | Ground-rail gantry travel |
| MH reference hoisting-speed range | 0.1–8 m/min |
| MH reference crane-travel range | 5–30 m/min |
The named crane-family figures shown here are published selection references, not a single rating for every crane in this category. Rated load, span, lifting height and duty are confirmed together in your quotation and approval drawing.
Price guide
Public supplier equipment-price references for the stated configuration, checked October 2026. These figures support early budgeting; your quotation will be based on the selected crane and supply scope. Freight, import duties, runway rails, foundations, installation and commissioning are additional unless included in the quotation.
| Configuration | Equipment budget | Supply scope |
|---|---|---|
| MH single-girder market referenceCapacity: 5 t · Span: 10.5–31.5 mA public comparable configuration for budgeting, not a quotation for this manufacturer or a guaranteed upper price. | USD 10,000–29,000per unit | Crane equipment reference; confirm inclusions and destination costs. |
| MH single-girder market referenceCapacity: 10 t · Span: 10.5–31.5 mA public comparable configuration for budgeting, not a quotation for this manufacturer or a guaranteed upper price. | USD 14,000–41,000per unit | Crane equipment reference; confirm inclusions and destination costs. |
| MH single-girder market referenceCapacity: 20 t · Span: 10.5–31.5 mA public comparable configuration for budgeting, not a quotation for this manufacturer or a guaranteed upper price. | USD 22,000–52,000per unit | Crane equipment reference; confirm inclusions and destination costs. |
Indicative market budgets for planning, not a quotation from Henan Mine Crane. Freight, taxes, runway steel and site installation are additional unless included in the scope shown. Request a quotation for your selected configuration.
What affects the price?
- Rated load, span and lifting height
- Working class, lifting speed and operating cycle
- Hoist, controls, cantilever and outdoor protection
- Delivery destination and installation scope
Typical configurations
Lifting mechanism
Electric hoist or lifting trolley
Match the lifting system to load, duty and the transfer process.
Travel arrangement
Ground rail, combined semi-gantry runway or rubber tires
Match the travel route and supporting arrangement to the selected crane class.
Site support
Full gantry, semi-gantry or mobile arrangement
Check clearances, hook coverage and support reactions for the intended site.
Final capacity, dimensions and operating functions are agreed for your load and site.
Compare related models
Compare the lifting arrangement and site layout before choosing a model.
Configuration
Single steel gantry girder, electric hoist, two ground-supported legs and fixed rail travel.
Consider it when
General factory, warehouse or yard handling requires a straightforward fixed gantry crane and hoist system.
Configuration
Two main gantry beams with seated electric-hoist trolley.
Consider it when
Load, span, hook geometry or structural requirements favor a double-girder crane system.
Configuration
Open steel truss gantry girder with reduced structural weight and wind area.
Consider it when
Outdoor wind exposure, crane self-weight or foundation reactions influence structural selection.
Plan your crane specification
Send a material-flow plan showing pickup and discharge positions, travel distances, vehicle routes and surrounding structures. Provide complete load weights and dimensions, attachment information, operating hours and handling frequency.
Add available geotechnical, foundation, rail or pavement information for the selected travel concept. Include site power details, environmental exposure, drainage or ground-level restrictions and the space available for delivery and erection.
List existing equipment and planned interfaces, including any process control or interlock requirements. Request a proposal that identifies included equipment, required site inputs and installation boundaries alongside the crane's main dimensions and operating parameters.
Frequently asked questions
What is included in a gantry crane system?
The working system can involve the crane structure, lifting and travel equipment, rails or running surface, power supply and controls. The quotation should state exactly which items and installation services are included.
Are foundations supplied with the crane?
Supply boundaries vary. Crane reactions and rail-interface requirements must be available for the site foundation design, and the proposal should identify responsibility for civil design, construction and installation.
Can a fixed-rail system be replaced by a mobile arrangement?
The handling route, ground loading, turning space and operating method must be reassessed. The two travel concepts have different site requirements and should be compared against the same handling task.












