Henan Mine Crane reported that a batch of cranes for Baosteel's non-oriented electrical-steel product optimization project passed A inspection from September 27 to 29, 2021.

The inspection team examined self-inspection records, material reports and nondestructive-testing documents, measured trolley and bridge structures and checked assembly of travel systems. Powered no-load trial operation was also completed.
Henan Mine Crane stated that the equipment met the contract's technical agreement and inspection outline. A dedicated company project team coordinated manufacturing quality and customer-appointed third-party inspections.











