In its August 16, 2026 report, Henan Mine Crane said a 500 t new-type double-girder crane had recently entered service at a high-speed railway construction project.

The equipment combines a lightweight structural design with variable-frequency control for heavy-load construction work. Multiple hooks can operate in synchronization, while electrical anti-sway control supports stable positioning of large components in challenging tunnel-construction conditions.
Digital monitoring, video-based protection and lifecycle-management functions provide operating-status information and risk alerts. The equipment was configured for the project's damp and dusty working environment.












