Henan Mine Crane supplied several overhead cranes, including 125t equipment, for a major water-conservancy project. The cranes were used to lift and install units in the project's underground pumping station, according to a January 2024 announcement.

The equipment uses PLC and variable-frequency-drive communication control. Multiple lifting points operate synchronously with automatic load-balance adjustment, while four-quadrant hoist operation provides controlled speed and high torque at low speed.
An integrated fault-detection system displays three-dimensional coordinates and operating, protective and fault signals. Diagnostic, alarm, recording, printing and communication functions support equipment monitoring.











