For an overhead or gantry crane, choose the controls around the operator's view of the load, travel route and site hazards. Compare the three arrangements against your layout and handling cycle:
- Pendant control: a wired station suspended from the hoist or a separate track. It suits work where the operator can follow the crane along a clear route. Check pendant travel, cable reach, obstructions and the operator's separation from moving equipment.
- Wireless radio control: lets the operator choose a position without a trailing control cable. Check sightlines, radio compatibility, battery charging and transmitter storage. Specify the required stop response if communication is lost, and agree how the operator will observe the load and receive signals.
- Cab control: provides a dedicated operator position on the crane for the planned handling process. Review pickup and set-down visibility, communication with ground personnel, access and exit routes, and protection from the working environment.
Send the supplier a layout showing operator routes, pickup and set-down points, travel distances and operating frequency. Agree emergency stopping, authorised operation and training requirements through the site risk assessment and the manufacturer's review; no method is universally best.








